Novara Boardwalk

Previous Next Client: City of Mandurah Location: Mandurah, WA   Novara Boardwalk Construction Scope of Work Summary: Develop alternative concept designs for client review Develop workshop DWGs and footing engineering Develop detailed environmental, safety and emergency management plans and frontline HSEQ documentation Detailed site survey and set-out Siteworks and vegetation clearing Install surefoot driven-pile anchor […]

Karijini National Park

Previous Next Client: Dept Biodiversity, Conservation & Attractions Location: Karijini National Park Karijini National Park Paths Scope of Work Summary: Site survey and set out. ​ Site demarcation and pedestrian/park user management.​ Excavation and controlled removal of vegetation. ​ Construction of new batters and falls to meet DDA access requirements​ Form pathways and install reinforcing.​ Pour over […]

Bridge 0601A

Previous Next Client: Main Roads Western Australia Location: Bruce Rock, WA Bridge 0601A Scope of Work Summary: Procurement of HDPE Pipe Culverts. Construction of temporary sidetrack. Removal of the existing bridge structure. Preparation of bedding, placement of HDPE Pipe Culverts and backfill of HDPE Pipe Culverts. Reinstatement of pavement and running surfaces. Installation of Guardrails […]

Wadandi Bridge Refurbishments

Previous Next Client: Shire of Augusta Margaret River Location: Margaret River, WA   Wadandi Bridge Refurbishments Scope of Work Summary: Site clearing and civil works Demolition of condemned bridge structures Design & fabricate 2 x replacement bridges including corrosion control and application of protective coatings Form and pour abutment foundations Installstone pitched embankments Install bridge […]

Kalgoorlie Station Refurbishment Works​

Previous Next Client: Public Transport Authority Location: Kalgoorlie, WA Kalgoorlie Station Refurbishment Works Scope of Work Summary: Installation of perimeter breathing strip to entire station structure to combat rising damp- inclusive of concret and asphalt reinstatement and heritage stonework remediation Roof Canopy Repair including 3500m2 of new roofing and stormwater drianage, new colums and heritage […]

Bridges 1203 & 1209 – Bridge Guardrail & Eps Replacement

Previous Next Client: Main Roads WA Location: Hamersley, WA   Bridges 1203 & 1209 – Bridge Guardrail & Eps Replacement Scope of Work Summary: Preparation and submission of all HSEQ documentation and extensive traffic management planning Liaison and negotiation with local government entities, utility and asset owners and nearby stakeholders Installation of new service runs […]

Whitfords Nodes Fitness Staircase

Previous Next Client: City of Joondalup   Location: Hillarys, WA Whitfords Nodes Fitness Staircase Scope of Work Summary: Comprehensive design analysis and risk identification program in consultation with the Principal Fabrication of over 550 individual steel members, including application of protective coatings and delivery to site laydown area. Development of a lift plan and load […]

A Berth Repairs

Previous Next Client: Fremantle Ports Location: Fremantle, WA   A Berth Repairs Structural repairs to the existing dilapidated wharf at A Berth in Fremantle Port.   Installation of a hung scaffold to underside of wharf.  Carry out half cap repairs, concrete pile repairs and installation of new steel structural members to support existing structure. Approximately 8 Months […]

Berth 8 Crane Rail

Previous Next Client: Fremantle Ports  Location: Fremantle, WA   Berth 8 Crane Rail Repairs Scope of Work Summary: Saw cut perimeter of failed crane rail on live container berth Remove delaminated concrete using UHP water blasting (hydro-demolition) Cut and remove damaged section of rail and plate Install new crane rail including baseplates, splice plates, spacer plates […]

Bridge 0594A

Previous Next Client: Main Roads WA Location: Quairading, WA   Bridge 0594A Scope of Work Summary:  Construction of temporary side-track● Removal of the existing bridge structure● Supply and construct bridge foundation, precast units and bridge deck● Reinstatement of pavement and running surfaces● Installation of Guardrails and Linemarkings Back to All Projects NEXT PROJECT Bridge 0910