Completed
Donnybrook Timber Bridge Replacement
A damaged timber bridge in Donnybrook replaced with a new single span steel bridge and precast concrete overlay, fabricated by our own boilermakers.
- Location
- Donnybrook, WAView on the map

Scope of work
Design and fabrication
- Steel bridge structure fabricated by Enviro boilermakers
Works on site
- Damaged timber bridge removed
- New single span steel bridge installed
- Precast concrete overlay




