Completed
Bridge 0601A
Replacement of Bridge 0601A at Bruce Rock with HDPE pipe culverts.
- Client
- Main Roads WA
- Location
- Bruce Rock, WAView on the map
- Service
- Infrastructure maintenance

Scope of work
- Procurement of HDPE pipe culverts
- Construction of a temporary sidetrack
- Removal of the existing bridge
- Bedding, culvert placement and backfill
- Pavement and running surfaces reinstated
- Guardrails and line marking




