Skip to content
Completed

Bridge 0601A

Replacement of Bridge 0601A at Bruce Rock with HDPE pipe culverts.

Client
Main Roads WA
Location
Bruce Rock, WAView on the map
Bridge 0601A, Bruce Rock

Scope of work

  • Procurement of HDPE pipe culverts
  • Construction of a temporary sidetrack
  • Removal of the existing bridge
  • Bedding, culvert placement and backfill
  • Pavement and running surfaces reinstated
  • Guardrails and line marking

Photos