Completed
Bridge 0034 Structural Refurbishment
Full structural refurbishment of Bridge 0034 at Arthur River, with a new widened deck and approaches.
- Client
- Main Roads WA
- Location
- Arthur River, WAView on the map

Scope of work
Planning and approvals
- HSEQ documentation and extensive traffic management planning
- Liaison with local government, utility and asset owners and nearby landowners
Structural refurbishment
- Testing and treatment of pile welding splices
- Supply and installation of 250UC89 pile bracket supports
- Type 1 and Type 3 bearing support brackets at the piers
- Pier half-cap and abutment full-cap replacements
- Abutment and wingwall concrete sheeting repairs
- Pile banding, and removal of a redundant steel pile
- Stringer and corbel installations
Deck, approaches and civil works
- Redundant bridge structure dismantled and disposed of
- New widened bridge deck (reinforced concrete overlay) and approach slabs
- Bridge guardrail removed and replaced
- Rock protection and spoon drains
- Asphalt laying and approaches reinstated for a smooth transition to the roadway
- Line marking reinstated




