Skip to content
Completed

Bridge 0034 Structural Refurbishment

Full structural refurbishment of Bridge 0034 at Arthur River, with a new widened deck and approaches.

Client
Main Roads WA
Location
Arthur River, WAView on the map
Bridge 0034 Structural Refurbishment, Arthur River

Scope of work

Planning and approvals

  • HSEQ documentation and extensive traffic management planning
  • Liaison with local government, utility and asset owners and nearby landowners

Structural refurbishment

  • Testing and treatment of pile welding splices
  • Supply and installation of 250UC89 pile bracket supports
  • Type 1 and Type 3 bearing support brackets at the piers
  • Pier half-cap and abutment full-cap replacements
  • Abutment and wingwall concrete sheeting repairs
  • Pile banding, and removal of a redundant steel pile
  • Stringer and corbel installations

Deck, approaches and civil works

  • Redundant bridge structure dismantled and disposed of
  • New widened bridge deck (reinforced concrete overlay) and approach slabs
  • Bridge guardrail removed and replaced
  • Rock protection and spoon drains
  • Asphalt laying and approaches reinstated for a smooth transition to the roadway
  • Line marking reinstated

Photos