Scope of work

Planning and approvals

  • Environmental, safety and emergency management plans and HSEQ documentation
  • Site survey and set-out

Works on site

  • Delaminated, drummy and loose concrete broken out beside the crane rails
  • Damaged crane rail and approved sub-base plate cut out and removed
  • Reinforcement cleaned back and coated with zinc-rich primer
  • Steel-fibre-reinforced S50 concrete, steel floated and broom finished for a non-slip, free-draining surface
  • Asphalt reinstated and levelled to existing

Handover

  • As-constructed (ASCON) drawings