Western Australia’s most versatile construction and infrastructure maintenance contractor.
Previous
Next

Client: Arc Infrastructure

Location: Wongan Hills, WA

Line 34 Bridges

Scope of Work Summary:

  • Grout / concrete patch crack sealing
  • Ultra High-Pressure Water Blast (UHPWB) 
  • reinforcement repairs 
  • Crack sealing/injection surface treatment
  • Protective surface treatment
  • Design & Installation of structural propping systems
  • Offsite disposal of waste concrete to licenced waste facility
  • Form, pour and cure repair concrete to Piers & abutments
  • Develop detailed environmental, safety and emergency management plans and frontline HSEQ documentation
  • Detailed site survey and set-out
  • Siteworks and vegetation clearing
  • Prepare and submit ASCON Drawings