Bridge 0594A

Previous Next Client: Main Roads WA Location: Quairading, WA   Bridge 0594A Scope of Work Summary:  Construction of temporary side-track● Removal of the existing bridge structure● Supply and construct bridge foundation, precast units and bridge deck● Reinstatement of pavement and running surfaces● Installation of Guardrails and Linemarkings Back to All Projects NEXT PROJECT Bridge 0910