Western Australia’s most versatile construction and infrastructure maintenance contractor.
Previous
Next

Client: Main Roads WA

Location: Pilbara Region, WA

 

Pilbara Bridge Maintenance Package

Scope of Work Summary:

Enviro Infrastructure were engaged by Main Roads WA to undertake maintenance and structural repairs to 13 bridges located in the Pilbara region. Sites were spread across 850km of highway between Port Hedland, Karratha and Newman and works included:

  • Expansion joint removal and replacement.
  • Guardrail repairs and upgrades.
  • Removal and replacement of approach slabs.
  • Minor ancillary repairs.