Refurbishment of Bridge 0930 Haydn Bunton Drive, over Urban Railway

Want create site? With Free visual composer you can do it easy.

Refurbishment of Bridge 0930 Haydn Bunton Drive, over Urban Railway

Project Description

Services Provided

  • Full Traffic Management Plan & mobilisation of traffic control devices
  • Submission of Rail Safety Management, Environmental Management, Safety Management Plans to relevant authorities- provision of rail safety personnel.
  • Design and installation of earthing and bonding systems
  • Engineering design & verification, fabrication and erection of temporary rail protection screens
  • Removal of existing rail protection screens and existing precast concrete footpaths
  • Form up & pour new cast in situ concrete footpaths with reinforcement bars
  • Fabrication of new rail protection screens, guard-railing, W Beams, and balustrades with isolation panels as per MRWA specifications
  • Profiling of approach slabs and installation of new asphalt surface to approach slabs and bridge deck.

Competency & Sound Judgement

The project included significant variations including the re-design of the footpaths halfway through the project from pre-cast to pour in-situ, we achieved a cost saving of $80,000.00 and also extended the rail protection barrier – as a result of our efforts we were awarded with the 2017 Civil Contractors Federation WA Category 1 Earth Award.