Penguin Island Boardwalk

Site survey and set out. Creation of shop drawings for approval by client and engineer. Excavation and controlled removal of vegetation. Construction of piled foundations

Read More

Guildford Rail Bridge

Enviro undertook work on the Guildford Rail Bridge, working closely with the Public Transport Authority to perform multiple scopes of work as per below: Removal &

Read More

Noble Falls Footbridge Replacement

Enviro were awarded this tender to remove an existing timber footbridge and replace it with a new concrete footbridge with steel stringers and tubular handrails.:Works included:

Read More